MCPs βΊ Seismic Blast Planner
Seismic Blast Planner is an enterprise-grade Model Context Protocol (MCP) micro-service from the M2MCent network. Premium agentic endpoint for seismic-blast-planner-mcp. Monetized via x402 on Base Mainnet ($0.25 USDC per execution). Zero-gas settlement.
Not monetized yet
Turn Seismic Blast Plannerβs tool calls into revenue: one disclosed sponsored slot, 70% revenue share, fail-open by design.
Install Seismic Blast Planner
For anyone using Seismic Blast Planner β no Lulu account neededclaude mcp add --transport http seismic-blast-planner https://seismic-blast-planner-mcp--evozim-hv.run.tools
9 field-tested tactics as a designed playbook plus skills your coding agent can run. Free.
Get the Kit βFAQ
Run: claude mcp add --transport http seismic-blast-planner https://seismic-blast-planner-mcp--evozim-hv.run.tools
Yes β itβs a remote MCP server, so no local install is needed.
ChatGPT: Settings β Connectors β Advanced β Developer mode β Add connector, then paste https://seismic-blast-planner-mcp--evozim-hv.run.tools.
Claude.ai: Settings β Connectors β Add custom connector, then paste the same URL.
Unrated out of 100, computed from cross-registry traction signals (installs, stars, registry presence) β never influenced by sponsorship.
Similar servers
Your server?
This is for the person who owns Seismic Blast Planner β adds Lulu Ads to your own code. Not the install steps above, those are for your users.
Copies a ready prompt: your coding agent installs the lulu-ads SDK, wires the slot, and applies the widget design guide.
or set up manually at getlulu.dev/publishers
Get verified so you can edit the page. Your badge is already live below β no claim needed for that.
Managed hosting with monetization built in β waitlist.
[](https://getlulu.dev/mcps/seismic-blast-planner)